Lifted the carpet 
Surely we can do something with this? 
Uncovered original woodwork effect from the 1920’s. Very hard to remove 
Detailed work but has to be removed as plaster wont stick to it. 
Wall cleared and ready for plastering 
Stripped out rotten wood round window 
Must remember not to lean on window 
Or even breathe on it too hard – not a lot holding it on 
Found some damp 
Damp fixed 
New plumbing going in 
Ceiling battens 
First plasterboard in place 
Note the pencil! 
Battens on walls in 
Use up some spare insulation we had lying around 
Harley inspects cabling 
Health and Safety check 
First inspection done – note insulated plasterboard in place 
Harley prefers his box – pretty disgusted with the whole thing really 
First fit for sockets and network points 
Ready for plastering – rewiring, cabling and plaster-boarding done 
Inspector James arrives 
Lovely new sockets and network points 
Plastering looks OK 
Inspection completed 
James prefers the box too! 
Walls painted with undercoat 
Walls painted with final coat 
All the glossing done 
Now, about this floor… 
Floor sorted 
Planning the cupboard layouts 
Planning the cupboard layouts on the other side 
Sockets – second fit in progress 
Skirting boards, cabinets and sockets 
Skirting boards, cabinets and sockets on the other side 