New office

  • Lifted the carpet
  • Surely we can do something with this?
  • Uncovered original woodwork effect from the 1920’s. Very hard to remove
  • Detailed work but has to be removed as plaster wont stick to it.
  • Wall cleared and ready for plastering
  • Stripped out rotten wood round window
  • Must remember not to lean on window
  • Or even breathe on it too hard – not a lot holding it on
  • Found some damp
  • Damp fixed
  • New plumbing going in
  • Ceiling battens
  • First plasterboard in place
  • Note the pencil!
  • Battens on walls in
  • Use up some spare insulation we had lying around
  • Harley inspects cabling
  • Health and Safety check
  • First inspection done – note insulated plasterboard in place
  • Harley prefers his box – pretty disgusted with the whole thing really
  • First fit for sockets and network points
  • Ready for plastering – rewiring, cabling and plaster-boarding done
  • Inspector James arrives
  • Lovely new sockets and network points
  • Plastering looks OK
  • Inspection completed
  • James prefers the box too!
  • Walls painted with undercoat
  • Walls painted with final coat
  • All the glossing done
  • Now, about this floor…
  • Floor sorted
  • Planning the cupboard layouts
  • Planning the cupboard layouts on the other side
  • Sockets – second fit in progress
  • Skirting boards, cabinets and sockets
  • Skirting boards, cabinets and sockets on the other side